Office Hours: Mon-Sat 10:00 AM - 5:30 PM

Projects

Projects associated with this ULB
Project Name

Construction of Paver Block Station at Lakhipur Public Bus stand at Haluapara

Amount
₹15,00,000.00
Ward Name
4
Physical Progress
100
Financial Progress
View on Google Map
Project Name

Construction of Paver Block Station at Lakhipur Public Bus stand at Haluapara

Amount
₹10,00,000.00
Ward Name
4
Physical Progress
100
Financial Progress
0
View on Google Map
Project Name

Construction of Paver Block Station at Lakhipur Public Bus stand at Haluapara

Amount
₹10,00,000.00
Ward Name
4
Physical Progress
100
Financial Progress
0
View on Google Map
Project Name

Construction of waiting shed building with Sanitary Toilet for Gens & Ladis at Lakhiur Public Bus Stand at Haluapara Ward No. 4

Amount
₹5,00,000.00
Ward Name
4
Physical Progress
100
Financial Progress
0
View on Google Map
Project Name

Purchasing of Twin Dustbin (Big/Small Size)

Amount
₹6,29,000.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Drain from Gokul Misra House to Topan Bhattacharji House(west side) Scheme under 14th FC 2018-19 (2nd installment)

Amount
₹11,00,000.00
Ward Name
9
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC Pavement Road from Brojendra Kishor Chakrabarty House to bamboo garden Scheme under 14th FC 2018-19 (2nd installment)

Amount
₹8,00,000.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Improvement of Mohila Somiti by earthfilling work near Bordoloi Hall North side Scheme under 14th FC 2018-19 (2nd installment)

Amount
₹2,00,000.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Drain from Sanjoy Mondal house to Sontosh Sarkar House upto south side of Road(west side) Scheme under 14th FC 2018-19 (2nd installment)

Amount
₹8,00,000.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Drain from Lakhipur H.S School east point to DR. Sankar Lal Saha house Municipal Culvert under 14th FC 2018-19 (2nd installment)

Amount
₹8,00,000.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Drain from DR. Sankar Lal Saha house Municipal Culvert to Bamunpara Kali Mondir Road Culvert (East side) under 14th FC 2018-19 (2nd installment)

Amount
₹7,00,000.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Bricks drain at Ramkrishna Asram road (East side) under 14th FC 2018-19 (2nd installment)

Amount
₹6,00,000.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC box culvert at Bamunpara kali Mondir Road near Hemendra Chakraborty house under 14th FC 2018-19 (2nd installment)

Amount
₹3,65,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Bricks drain at Bamunpara Kali Mondir Road (South Side) from Dipak Choudhury House to Satyan Roy Master House under 14th FC 2018-19 (2nd installment)

Amount
₹46,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Bricks drain at Amlapatty Road (west Side) from Satyan Roy House to Rajib Bhawan under 14th FC 2018-19 (2nd installment)

Amount
₹4,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC box culvert at Devibari Road under 14th FC 2018-19 (2nd installment)

Amount
₹2,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Bricks drain at Rajbari Road (west side ) from ICICI Bank to PWD Road under 14th Finance Commission for the year 2019-20

Amount
₹10,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Improvement of Rajbari Road with CC pavement from ICICI Bank to PWD Road under 14th Finance Commission for the year 2019-20

Amount
₹12,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Constn of Paver Block Road at Shishujyoti L.P School under 14th Finance Commission for the year 2019-20

Amount
₹7,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of road at Lakhipur Smoshan from PWD road to cremation platform under 14th Finance Commission for the year 2019-20

Amount
₹6,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Bricks drain at Hatipara Road ( south side ) from Arun Karmakar house to Paglafeta Beel under 14th Finance Commission for the year 2019-20

Amount
₹3,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Constn of Paver Block Road of Khakilamari Das Para Kali Mondir Road under 14th Finance Commission for the year 2019-20

Amount
₹6,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earthfilling work at Ramkrishna Asram High School field under 14th Finance Commission for the year 2019-20

Amount
₹4,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Paver Block Road at Welkin English School Road under 14th Finance Commission for the year 2019-20

Amount
₹7,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Drain at Natun Bazar inner Golli road (North side) from Tatu Master house to Dinuya Chouhan House under 14th Finance Commission for the year 2019-20

Amount
₹6,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Constion of remaining outlet drain from Ramkrishna Ashram School back side under 14th Finance Commission for the year 2019-20

Amount
₹12,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Constn of Drain from Nadu house to Fersatary beel under 14th Finance Commission for the year 2019-20

Amount
₹13,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Constn of Boundary wall at Lakhipur Naam ghor at Amlapatty under 14th Finance Commission for the year 2019-20

Amount
₹2,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Improvement of Bihu Stage at Lakhipur Public Play field under 14th Finance Commission for the year 2019-20

Amount
₹2,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Constn of Paver Block Road of Khakilamari inner golli Road from Minoti Hajong house to Bablu Chakrabarty House under 14th Finance Commission for the year 2019-20

Amount
₹8,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Extension of bricks drain at Manaspara East Road from Nasir Master house to Anser Master house under 14th Finance Commission for the year 2019-20

Amount
₹6,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Extension of Paver Block Road at Milon nagar Tema Para from Ruhul Khandakar house to Pukhuripar road under 14th Finance Commission for the year 2019-20

Amount
₹5,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC floor infront of Mini Stadium cum RCC Market shed Building at Lakhipur Public play field near Lakhipur Hospital

Amount
₹5,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Extension of Drain at Folimari PWD Road (north side) near Folmari Bazar

Amount
₹3,19,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC Pavement Road at College Nagar Road from College Road to Sorhab Ali House Road under 14th Finance Commission for the year 2019-20

Amount
₹4,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC Pavement footpath at Natun Bazar road (East Side) from Lakhipur PTC to Laxman Prasad house under 14th Finance Commission for the year 2019-20

Amount
₹6,86,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC Pavement footpath at Natun Bazar road (West Side) from Lakhipur Devibari Durga Mandir point to Soleman house under 14th Finance Commission for the year 2019-20

Amount
₹6,26,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC Slab on drain at Natun Bazar and Main Bazar drain Ward No.7, under 14th Finance for the year 2019-20

Amount
₹10,48,200.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Paid to CA Auditor as per order of Director, Municipal administration, Assam, Dispur, Ghy-6

Amount
₹70,800.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earthfilling & GSB work on Manashpara road to Abdul Waheb house road Scheme under 14th FC 2016-17 (2nd installment)

Amount
₹2,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC Pavement on Folimari Shantipur to Dalimon house road , Ward No.1, Scheme under 14th FC 2016-17 (2nd installment)

Amount
₹3,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earthfilling & GSB work on Manashpara road to Rofik house road Scheme under 14th FC 2016-17 (2nd installment)

Amount
₹1,46,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Eartfilling and GSB work at Temapara Golli road from Kalam Ali house to Azizur Sheikh house under 14th FC 2016-17 (2nd installment)

Amount
₹1,80,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Installation of 60 Nos hand Tube Well at W/N.2 under 14th Finance commission of General Basic Grant for the year 2016-17 2nd Installment

Amount
₹4,20,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of HP Culvert at Lakhipur Idgah area near Muzaharul house, W/N.2 under 14th Finance commission of General Basic Grant for the year 2016-17 2nd Installment

Amount
₹3,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Repairing of public Toilet and providing running water facility at Lakhipur Fish Market, W/N.3 under 14th Finance commission of General Basic Grant for the year 2016-17 2nd Installment

Amount
₹1,40,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Installation of 26 Nos hand Tube Well at W/N.3 under 14th Finance commission of General Basic Grant for the year 2016-17 2nd Installment

Amount
₹1,95,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC Pavement road at Itakhuli Golli road, W/N.3 under 14th Finance commission of General Basic Grant for the year 2016-17 2nd Installment

Amount
₹1,65,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling & GSB work at Ghoshpara Golli road, W/N.3 under 14th Finance commission of General Basic Grant for the year 2016-17 2nd Installment

Amount
₹1,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling & GSB work on road from Gorumara Pahar to Adhindra Hajong road, W/N.4 under 14th Finance commission of General Basic Grant for the year 2016-17 2nd Installment

Amount
₹2,37,500.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Installation of 33 Nos hand Tube Well at W/N.4 under 14th Finance commission of General Basic Grant for the year 2016-17 2nd Installment

Amount
₹4,12,500.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of low cost Latrine at Ward No.1 Area under 14th Finance commission of General Basic Grant for the year 2015-16 1st Installment

Amount
₹1,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling & GSB on Road to Dararpar Golli Road, W N.1 under 14th Finance commission of General Basic Grant for the year 2015-16 1st Installment

Amount
₹2,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling & Mateling on Road from Shantipur Golli Road to Samsul House, W N.1 under 14th Finance commission of General Basic Grant for the year 2015-16 1st Installment

Amount
₹2,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Installation of Hand Tube Well at W/N.4 under 14th Finance commission of General Basic Grant for the year 2015-16 1st Installment

Amount
₹70,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of low cost Latrine at Ward No.4 Area under 14th Finance commission of General Basic Grant for the year 2015-16 1st Installment

Amount
₹30,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Drain at Haluapara from Putul Rabha house to haren Deka house, W/N.4 under 14th Finance commission of General Basic Grant for the year 2015-16 1st Installment

Amount
₹2,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Entrance gate at Shivbari Hirapara road, W/N.4 under 14th Finance commission of General Basic Grant for the year 2015-16 1st Installment

Amount
₹2,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of low cost Latrine at Ward No.3 Area under 14th Finance commission of General Basic Grant for the year 2015-16 1st Installment

Amount
₹1,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Assam Type market Building at Lakhipur Daily Bazar, W/N.3 under 14th Finance commission of General Basic Grant for the year 2015-16 1st Installment

Amount
₹1,25,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Drain with RCC Slab at Amlapatty from Mokbul Hussain to Manobendra D. Gupta house, W/N.3 under 14th Finance commission of General Basic Grant for the year 2015-16 1st Installment

Amount
₹2,41,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Installation of 10 nos.Hand Tube Well at W/N.2 under 14th Finance commission of General Basic Grant for the year 2015-16 1st Installment

Amount
₹66,443.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of lowcost Latrine at Ward No.2 Area under 14th Finance commission of General Basic Grant for the year 2015-16 1st Installment

Amount
₹1,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC Pavement Road at Milon Nagar from Biswajit to Dhiren Barman House, W/N.2 under 14th Finance commission of General Basic Grant for the year 2015-16 1st Installment

Amount
₹3,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC Drain at Lakhipur Folimari Koborsthan, W/N.1 under 14th Finance commission of General Basic Grant for the year 2015-16 2nd installment

Amount
₹2,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling & GSB work on Folimari Dararpar road from Samsul house to Badshah house under 14th Finance commission of General Basic Grant for the year 2015-16 2nd installment

Amount
₹2,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling & GSB work on Shantipur from Shantipur road to Ex MLA House under 14th Finance commission of General Basic Grant for the year 2015-16 2nd installment

Amount
₹1,25,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC Drain at Bamunpara from Gautam Sarkar house to Lakhipur GAS Agency back side, W/N.2 under 14th Finance commission of General Basic Grant for the year 2015-16 2nd installment

Amount
₹4,28,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Installation of Hand Tube Well at W/N.2 under 14th Finance commission of General Basic Grant for the year 2015-16 2nd installment

Amount
₹84,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC Slab at Lakhipur Daily Market Golli road, W/N.3 under 14th Finance commission of General Basic Grant for the year 2015-16 2nd installment

Amount
₹1,37,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC drain with slab at Lakhipur Shoilaja Kanto Bose Road in front of English School Lakhipur under 14th Finance commission of General Basic Grant for the year 2015-16 2nd installment

Amount
₹2,75,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC Pavement road at Itakhuli Golli road under 14th Finance commission of General Basic Grant for the year 2015-16 2nd installment

Amount
₹1,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Installation of 33 Nos Hand Tube Well at W/N.4 under 14th Finance commission of General Basic Grant for the year 2015-16 2nd installment

Amount
₹4,12,500.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Installation of 9 Nos Hand Tube Well at W/N.4 under 14th Finance commission of General Basic Grant for the year 2015-16 2nd installment

Amount
₹1,14,507.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling & GSB work at Folimari Koborsthan, W/N.1 under 14th Finance commission of General Basic Grant for the year 2016-17 1st installment

Amount
₹2,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling & GSB work on Dararpar road (Gadlarpum), W/N.1 under 14th Finance commission of General Basic Grant for the year 2016-17 1st installment

Amount
₹4,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Installation of 12 Nos hand Tube Well at W/N.1 under 14th Finance commission of General Basic Grant for the year 2016-17 1st installment

Amount
₹1,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Repairing of CC Pavement road at Paulpara, W/N.2 under 14th Finance commission of General Basic Grant for the year 2016-17 1st installment

Amount
₹70,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC Pavement Golli road with narrow drain on road one side of Milon Nagar from Gobindo Paul to Abhay Bhatta house, W/N.2 under 14th Finance commission of General Basic Grant for the year 2016-17 1st installment

Amount
₹2,80,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling & GSB work on College Nagar Golli road from Nozrul Islam to Abdul baten Mondal house, W/N.2 under 14th Finance commission of General Basic Grant for the year 2016-17 1st installment

Amount
₹1,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of drain at Lakhipur Modina Masjid road, W/N.3 under 14th Finance commission of General Basic Grant for the year 2016-17 1st installment

Amount
₹1,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Footpath at Lakhipur Fish Market, W/N.3 under 14th Finance commission of General Basic Grant for the year 2016-17 1st installment

Amount
₹2,19,720.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Installation of 10 Nos hand Tube Well at W/N.3 under 14th Finance commission of General Basic Grant for the year 2016-17 1st installment

Amount
₹72,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC Pavement Golli road from Natun Bazar main road to Basudev Das house, W/N.3 under 14th Finance commission of General Basic Grant for the year 2016-17 1st installment

Amount
₹1,65,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC Pavement road on Haluapara Holi Mondir road at W/N.4 under 14th Finance commission of General Basic Grant for the year 2016-17 1st installment

Amount
₹4,51,500.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Brick Pucca drain at Haluapara kali Mondir (west Side) from Bistu Rabha to Khushi Saha house, W/N.4 under 14th Finance commission of General Basic Grant for the year 2016-17 1st installment

Amount
₹2,98,500.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling & GSB work with narrow drain at Lakhipur Light Vehicle stand, W/N.4 under 14th Finance commission of General Basic Grant for the year 2016-17 1st installment

Amount
₹2,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Bricks drain at Manashpara East Road, west Side from Gofur Master house to Latif Master House under 14th Finance Commission for the year 2018-19 (1st installment).

Amount
₹5,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Extension Bricks Drain at N.N.Choudhury Road from Aminur Islam house to Subhash sen House under 14th Finance Commission for the year 2018-19 (1st installment).

Amount
₹5,73,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Bricks drain at Rajbari Road from ICICI Bank to Santak Sipani Shop under 14th Finance Commission for the year 2018-19 (1st installment).

Amount
₹9,60,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Bricks Drain at Bamunpara Kali Mondir Road from Lokpriyo Gopinath Bordoloi Hall corner point to Jyotirmoy Chakraborty house under 14th Finance Commission for the year 2018-19 (1st installment).

Amount
₹11,52,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Bricks Drain at N.N.Choudhury Road East Side from Old Circle Office to Himu Chakraborty house under 14th Finance Commission for the year 2018-19 (1st installment).

Amount
₹13,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Bricks Drain at Haluapara Bishnu Rabha Road from Rofikul House to Modina Mosjid point Chariali Road under 14th Finance Commission for the year 2018-19 (1st installment).

Amount
₹4,56,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling, GSB & metaling work at Haluapara Kali Mondir Golli road, W/N.4 under 14th Finance commission of General Basic Grant for the year 2017-18 (1st installment)

Amount
₹4,04,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling & GSB work at Shantipur road to Aduri house road, W/N.1 under 14th Finance commission of General Basic Grant for the year 2017-18 (1st installment)

Amount
₹3,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling & GSB work at Dararpar road to Mozid house road, W/N.1 under 14th Finance commission of General Basic Grant for the year 2017-18 (1st installment)

Amount
₹1,75,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling work on road at Irrigation road to Somer house road, W/N.1 under 14th Finance commission of General Basic Grant for the year 2017-18 (1st installment)

Amount
₹1,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling & GSB work at Gadlarpum road to Ruhul house road, W/N.1

Amount
₹2,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling & GSB work at Bamunpara road to Debobroto Chakraborty house road, W/N.2 under 14th Finance commission of General Basic Grant for the year 2017-18 (1st installment)

Amount
₹1,30,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Boundary wall at Fesertary Kali Mondir, W/N.2 under 14th Finance commission of General Basic Grant for the year 2017-18 (1st installment)

Amount
₹1,20,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling & GSB work at College Nagar Mosjid to Mohommod Ali house road, W/N.2 under 14th Finance commission of General Basic Grant for the year 2017-18 (1st installment)

Amount
₹2,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling & GSB work at College Nagar from Saddam house to Hussain Ali house road, W/N.2 under 14th Finance commission of General Basic Grant for the year 2017-18 (1st installment)

Amount
₹1,10,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Installation of Hand Tube Well with Platform at W/N.2 under 14th Finance commission of General Basic Grant for the year 2017-18 (1st installment)

Amount
₹1,65,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Septic Tank at Bordoloi Hall, W/N.2 under 14th Finance commission of General Basic Grant for the year 2017-18 (1st installment)

Amount
₹1,00,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of drain at Bazar Golli road infront of Bhushon Master house, W/N.3 under 14th Finance commission of General Basic Grant for the year 2017-18 (1st installment)

Amount
₹60,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC Slab at Natun Bazar Golli road, W/N.3 under 14th Finance commission of General Basic Grant for the year 2017-18 (1st installment)

Amount
₹1,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Installation of Hand Tube Well with Platform at W/N.3 under 14th Finance commission of General Basic Grant for the year 2017-18 (1st installment)

Amount
₹1,25,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Extension of RCC drain at Amlapatty Golli road near EX MLA house, W/N.3 under 14th Finance commission of General Basic Grant for the year 2017-18 (1st installment)

Amount
₹2,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Extension of Paver Block road at Nidanpur Ambagan, W/No.3 under 14th Finance commission of General Basic Grant for the year 2017-18 (1st installment)

Amount
₹1,30,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC Pavement road at Ghoshpara Golli road, W/No.3 under 14th Finance commission of General Basic Grant for the year 2017-18 (1st installment)

Amount
₹90,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Boundary wall at Itakhuli Mosjid, W/N.3 under 14th Finance commission of General Basic Grant for the year 2017-18 (1st installment)

Amount
₹70,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Installation of 32 Nos Hand Tube Well with Platform at W/N.4 under 14th Finance commission of General Basic Grant for the year 2017-18 (1st installment)

Amount
₹4,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

One Time Assistance for COVID under 14th Finance Commission for the year 2018-19 (1st Installment)

Amount
₹15,25,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling and sand gravel work at Manashpara Road to Lutfor House Road under 14th FC for the year 2017-18 (2nd Installment) under Lakhipur Municipal Board, Lakhipur Dist. Goalpara (Assam).

Amount
₹1,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth filling and sand gravel work at Golli Road from Gadlapam Road to Chandmiah House Road under 14th FC for the year 2017-18 (2nd Installment) under Lakhipur Municipal Board, Lakhipur Dist. Goalpara (Assam)

Amount
₹2,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Extension of Bricks drain with RCC slab at Folimari Koborsthan under 14th FC for the year 2017-18 (2nd Installment) under Lakhipur Municipal Board, Lakhipur Dist. Goalpara (Assam).

Amount
₹1,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Extension of Paver Block road at Fesartary from Gadu master House to Nitai Mondol House, W/N.2 under 14th FC for the year 2017-18 (2nd Installment) under Lakhipur Municipal Board, Lakhipur Dist. Goalpara (Assam).

Amount
₹4,85,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earthfilling and GSB work at Bamunpara Golli Road under 14th FC for the year 2017-18 (2nd Installment) under Lakhipur Municipal Board, Lakhipur Dist. Goalpara (Assam).

Amount
₹1,40,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Installation of 25 Nos Hand Tube Well at W/N.2 under 14th FC for the year 2017-18 (2nd Installment) under Lakhipur Municipal Board, Lakhipur Dist. Goalpara (Assam).

Amount
₹1,75,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Imprvement of Lakhipur Mosjidpara Golli Road ( Near Nurul Mvi house ) under 14th FC for the year 2017-18 (2nd Installment) under Lakhipur Municipal Board, Lakhipur Dist. Goalpara (Assam).

Amount
₹1,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC slab on drain at Lakhipur Bazar Roadside drain under 14th FC for the year 2017-18 (2nd Installment) under Lakhipur Municipal Board, Lakhipur Dist. Goalpara (Assam).

Amount
₹1,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Waiting Shed at Lakhipur Iron Bridge Tiniali under 14th FC for the year 2017-18 (2nd Installment) under Lakhipur Municipal Board, Lakhipur Dist. Goalpara (Assam).

Amount
₹2,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earthfilling and GSB work on Road at Rajbari New Golli Road from Garaghat Durga Mondir under 14th FC for the year 2017-18 (2nd Installment) under Lakhipur Municipal Board, Lakhipur Dist. Goalpara (Assam).

Amount
₹1,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Installation of Hand Tube Well at Ward No.3 under 14th FC for the year 2017-18 (2nd Installment) under Lakhipur Municipal Board, Lakhipur Dist. Goalpara (Assam).

Amount
₹1,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC slab on drain at Haluapara kali Mondir Road with one RCC slab Culvert from Biju Rabha house to Bistu Rabha house under 14th FC for the year 2017-18 (2nd Installment) under Lakhipur Municipal Board, Lakhipur Dist. Goalpara (Assam).

Amount
₹2,29,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earth fillingand Sand Gravel work at Khakilamari Coloni road from Narayan house to Nitai house Road under 14th FC for the year 2017-18 (2nd Installment) under Lakhipur Municipal Board, Lakhipur Dist. Goalpara (Assam).

Amount
₹1,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Installation of Hand Tube Well at Ward No.4 under 14th FC for the year 2017-18 (2nd Installment) under Lakhipur Municipal Board, Lakhipur Dist. Goalpara (Assam).

Amount
₹4,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Brick drain at Manaspara Road from Amiruddin House to Mosjid House under 14th FC for the year 2017-18 (2nd Installment) under Lakhipur Municipal Board, Lakhipur Dist. Goalpara (Assam).

Amount
₹4,00,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Buying TATA LPK 407 Tipper (Part Payment) under 14th Finance commission of General Basic Grant for the year 2015-16 1st Installment

Amount
₹50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

installation of tubewell at ward no 2

Amount
₹66,443.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

installation of hand tubewell at ward no 4

Amount
₹70,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

construction of low cost latrine at ward no 1

Amount
₹1,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

construction of rcc drain with slab at amiapatty from mukbul hussain house

Amount
₹2,41,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Road

Amount
₹6,30,000.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earthfilling

Amount
₹6,00,000.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Pavar Block Road

Amount
₹6,00,000.00
Ward Name
2
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

RCC culvert

Amount
₹2,50,000.00
Ward Name
4
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of Bricks drain

Amount
₹6,00,000.00
Ward Name
5
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Bricks drain

Amount
₹4,50,000.00
Ward Name
6
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Bricks drain

Amount
₹6,00,000.00
Ward Name
7
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Bricks drain

Amount
₹11,00,000.00
Ward Name
8
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earthfilling & GSB work

Amount
₹6,00,000.00
Ward Name
10
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earthfilling

Amount
₹1,50,000.00
Ward Name
6
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earthfilling

Amount
₹83,750.00
Ward Name
6
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earthfilling

Amount
₹72,410.00
Ward Name
6
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

SBM WORK

Amount
₹9,00,000.00
Ward Name
5
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

RCC Drain

Amount
₹7,00,000.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

CC Pavement road

Amount
₹6,00,000.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

CC Pavement road

Amount
₹6,00,000.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Paver Block road

Amount
₹12,83,000.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Box Culvert

Amount
₹2,50,000.00
Ward Name
5
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

CC Pavement road

Amount
₹4,00,000.00
Ward Name
5
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

GSB work

Amount
₹3,00,000.00
Ward Name
6
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

GSB work

Amount
₹3,00,000.00
Ward Name
6
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

CC Pavement road

Amount
₹6,00,000.00
Ward Name
8
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

CC Pavement road

Amount
₹6,00,000.00
Ward Name
9
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

CC Pavement road

Amount
₹6,00,000.00
Ward Name
10
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Boundary Wall at Dumping ground of SWM.

Amount
₹9,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Boundary Wall at Dumping ground of SWM.

Amount
₹9,50,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Purchasing of JCB

Amount
₹32,75,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Purchasing of Dustbin

Amount
₹6,29,500.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Purchase of Uniform, Gum Boot, Gloves, Helmet… etc.

Amount
₹2,42,640.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Beautification of Bamunpara Pond at Ward No.4, Lakhipur Town

Amount
₹10,00,000.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Improvement of CC Pavement at Lakhipur Daily and Weekly Market PWD Road, Ward No.7,Lakhipur Town.

Amount
₹17,09,750.00
Ward Name
7
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC (G+2) Office Building at Lakhipur Municipal Board Office, Ward No.4, Lakhipur Town.

Amount
₹44,45,350.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Installation of 36 Nos Hand Tube well at Lakhipur Town.

Amount
₹2,52,000.00
Ward Name
n/a
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Drain

Amount
₹6,10,000.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Brick drain

Amount
₹8,31,000.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Bricks drain

Amount
₹7,71,000.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Bricks drain

Amount
₹7,71,000.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Bricks Drain at Hospital Road from Hospital Chariali to culvert infront of Lakhipur Town High School (North Side) under 15th Finance Commission for the year 2020-21 (1st Installment).

Amount
₹8,02,450.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of bricks Drain at Devibari Road east Side Near Lakhipur Post Office under 15th Finance Commission for the year 2020-21 (1st Installment).

Amount
₹10,45,000.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Bricks drain at Etakhuli Road Side from PWD roar to Culvert under 15th Finance Commission for the year 2020-21 (1st Installment).

Amount
₹11,00,000.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC Culvert at Mabashpara infront of Gofur Master House.

Amount
₹4,00,000.00
Ward Name
1
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earthfilling and GSB work at Gadlarpam road from Abdul Wahid house to Aynal Hoque house.

Amount
₹3,00,000.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Bricks Drain at Hirapara Road from Rajesh Bhagat House to Dipjyoti Das Cloth Store under 15th Finance Commission for the year 2020-21 (1st Installment).

Amount
₹7,60,000.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC Box Culvert at Milon Nagar near House of Anowar Hussain Master.

Amount
₹3,10,000.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of CC Pavement Road at Lakhipur Hospital Campus Road under 15th Finance Commission for the year 2020-21 (1st Installment).

Amount
₹14,00,000.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Waiting Shed at infront of Old Circle Office, Lakhipur under 15th Finance Commission for the year 2020-21 (1st Installment).

Amount
₹3,82,450.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Waiting Shed at infront of Circle Office, Nidanpur under 15th Finance Commission for the year 2020-21 (1st Installment).

Amount
₹3,82,450.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Improvement of Lakhipur Light Vehicle Stand under 15th Finance Commission for the year 2020-21 (1st Installment).

Amount
₹5,00,000.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Tyles fitting floor and steel frame doors & windows with Grill of Lakhipur Municipal Board Office under 15th Finance Commission for the year 2020-21.

Amount
₹5,94,650.00
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of Bricks drain at Old Circle Office from Lakhan Saha House to N.N.Choudhury road under 15th Finance Commission for the year 2020-21 (1st installment).

Amount
₹3,50,000.00
Ward Name
3
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earthfilling and GSB work at Bamunpara Goli road near Niva Ghosh house.

Amount
₹5,00,000.00
Ward Name
4
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC Box Culvert at Fesertary road from Ranjit Karmakar house to Prabhat Bhatta house.

Amount
₹3,00,000.00
Ward Name
5
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Earthfilling and GSB work at Etakhuli road from Etakhuli main road to Surman Ali House.

Amount
₹3,41,000.00
Ward Name
6
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC Box Culvert at Natun Bazar road near wooden Market.

Amount
₹3,00,000.00
Ward Name
7
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC Box Culvert at Haluapara road near Whole Sale Vegetable Market.

Amount
₹3,10,000.00
Ward Name
9
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Extension of Brricks drain with repairing of old damaged drain at Bokultola road (both side of road) from Video Hall road to Tunty house.

Amount
₹3,35,000.00
Ward Name
9
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Construction of RCC Box Culvert at Khakilamari Coloney road near River Bank.

Amount
₹3,50,000.00
Ward Name
10
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Repairing of Both side drain at Bokultola near Pintu Tewari house.

Amount
₹4,00,000.00
Ward Name
9
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Earthfilling work at Bokultola road East Side from Shivbari Gate.

Amount
₹2,00,000.00
Ward Name
9
Physical Progress
0
Financial Progress
0
View on Google Map